Please select one of the following as your project.
Implement Centralized Two Phase Locking Local vs Global Transactions in Optimistic CC Replicated Copy Control: Correct Read-From Precedence Adaptability Semantics Three Phase Commit Protocol Site Failure/Network Partitions Fail-Locks and Database Recovery Detection of Network Partitions
Many of these projects need further details, but the students should
be able to make a decision now.
Projects will require further research by students also. Please hand
in all project plans to Mridul (TA) on
February 26, 2002.
After you complete your project, you are required to give a 15 - 20
minute demonstration to Mridul (TA). You are also required to give a 2-3
page documentation and report. The format of the report will be given later.
The detailed grading policy will be given later. The project carries a
weight of 30% of the grade.
Last Date for Submission: April 16, 2002 (10% will be taken off
for each lecture after the due date). Project report is due on the same
date.