Please select one of the following as your project.
Implement Centralized Two Phase Locking Local vs Global Transactions in Optimistic CC Replicated Copy Control: Correct Read-From Precedence Adaptability Semantics Three Phase Commit Protocol Site Failure/Network Partitions Fail-Locks and Database Recovery Detection of Network Partitions Peer-to-Peer Multimedia Distribution
Many of these projects need further details, but the students should be able to make a decision now.
Projects will require further research by students. Please hand
in all project plans on
Jan 31, 2011.
After you complete your project, you are required to give a 15 - 20
minute demonstration to the TA. You are also required to give a 2-3
page documentation and report. The format of the report will be given
later.
The detailed grading policy will be given later. The project carries a
weight of 30% of the grade.
Last Date for Submission: April 18, 2011 (10% will be taken
off
for each lecture after the due date). Project report is due on the same
date as Homework 5.