CS 407 Software Engineering 
Spring 1999 Team Project Presentation Schedule 
Room LAEB 3288 (Ameritech Classroom)
3-3:30pm
 
Day/Date  
Topic  
Comments  
     Last  update: 2/17/99
Th 1/28 Project Progress 1 Design Review I: Tellabs project.
Th 2/4 Project Progress 2 Design Review II: Tivoli project.
Th 2/11 Project Progress 3 Code Review I: Tellabs project.
Th 2/18 Project Progress 4 Code Review I: Tivoli project.
Th 2/25 Project Progress 5 Code Review II: Tellabs project.
Th 3/4 Project Progress 6 Code Review II: Tivoli project.
Th 4/1 Project Progress 7 Feature/Code  Review :Tellabs project.
Th 4/8 Project Progress 8 Feature /CodeReview: Tivoli project.
Th 4/15 Project Progress 9 Product preview: Tellabs project.
Th 4/22 Project Progress 10 Product preview: Tivoli project.
T 4/27 Product Demo:  at Tellabs Tellabs: SHERLOCK
Th 4/29 Product Demo: at Tivoli Tivoli: Lotus-POM
Back to Schedule
Back to CS 407 Homepage