Record of CS 406 Project Meetings
 
Intel Project Team and Group  Meetings 

Tellabs Project Team and Group Meetings 

Instructor and Team/Group Meetings  
 

Last updated:  November 30, 1997
 
The meetings accounted for on this page do NOT include scheduled class hours.
 
BACK TO PROJECT
BACK TO CS406 HOMEPAGE
 
 
 
 
 
 
 
 
 
 
Intel Project
 
Team/Group
Total Time spent (h:hours m:minutes)
   
I1
 Insufficient data
I2
 7h 15m
I3
 4h 15m
I4
 10h 45m
Group A
 17h 55m
Group B
 50h 15m
BACK TO TOP OF PAGE
 
 
 
 
 
 
 
Tellabs Project
 
Team/Group
Total Time spent (h:hours m:minutes)
   
T1
 69h 40m
T2
 14h 0m
T3
 31h 10m
T4
 36h 38m
Group A
 7h 20m
Group B
 3h 15m
 BACK TO TOP OF PAGE
 
 
 
 
 
 
 
Instructor Meetings
 
Team/Group 
Date and duration  
 
Comments 
 
All teams  September 6 
1-2pm           
Discussed upcoming presentation protocol, format and content of the  presentation material.
Intel  groups  September 14 
11:11:40am
Discussed content of Intel project presentation, pointed out lessons from Tellabs project presentation.
Tellabs groups  September 21 11:11:35am Discussed organization of Tellabs project presentation.
Intel groups September 28 
11:11:30am
Discussed requirements document format and Monday presentation.
Tellabs groups October 5 11:11:30am Discussed the format of the design presentation scheduled for Wednesday.
Intel groups October 19 2-3:30pm Discussed presentation format, reviewed sequence diagrams, and progress of each team.
Tellabs groups October 26 2:00-2:50pm Discussed presentation format, design document, prototyping, and team progress.
Intel groups November 1 11-11:30am Discussed Wednesday presentation sequence and prototyping strategy. 
Tellabs groups November 9 
2:2:30pm
Discussed  prototyping.
Intel groups November 16 
2:2:40pm
Discussed design report 1.0, prototyping strategy.
Tellabs groups November 23 2-2:40pm Discussed prototyping and demo on 11/24.
 
 BACK TO TOP OF PAGE