CS 406 Software Engineering I

Fall 2001

PRESENTATION TIMES: 3-4:15pm Room: Stewart Center Room STEW G052

Contact: John Strthman: 765-494-1038 or John Holladay: 765-494-1032

Steve Sloan: 765-496-6067 Nancy Dietrich (Admin Related): 765-494-1031

Codec Dial-up Number: Lead ISDN #765-496-8722 Transmission Speeds: Up to 384 kbps

Class size: 32   Project Teams: 6  Team Size: 5*  Teams per sponsor: 1 or 2

Dial-in times for each sponsor are indicated in the table below. All times in pm and are Indiana times. Note special days and times for the final presentations. Any remaining class time remaining after video conferencing will be fully utilized to provide feedback to students, answer their questions regarding course material, or cover regular class material.

Attendance is required during the video conference.

Day/Date
Topic
Teams/Sponsors
Th 9/13 Project Progress 1A

Sample Presentation 1

Sample Presentation 2

Requirements: Understanding the problem and use cases
15 minutes per team
2:55: HP 3:30: Boeing
Th 9/20 Project Progress 1B Requirements: Understanding the problem and use cases
15 minutes per team

2:55: Peregrine 3:30: Tektronix

Th 9/27 Project Progress 2A Analysis: Conceptual Model, expanded use cases.15 minutes per team.

2:55: Peregrine 3:30: Boeing

M 10/9-T 10/10 Classes do not meet. October Break. HP and Tektronix teams: Make sure you prepare your presentation in advance.
Th 10/11 Project Progress 2B Analysis: Conceptual Model, expanded use cases.

2:55: HP 3:30: Tektronix

Th 10/18 Project Progress 3A Design I: System Architecture and Collaboration Diagrams
15 minutes per team.

2:55: Peregrine 3:30: Boeing

Th 10/25 Project Progress 3B Design I: System Architecture and Collaboration Diagrams
15 minutes per team.

2:55: HP 3:30: Tektronix

Th 11/1 Project Progress 4A Prototype Preview I15 minutes per team.

2:55: Peregrine 3:30: Boeing

Th 11/8 Project Progress 4B Prototype Preview II15 minutes per team

2:55: HP 3:30: Tektronix

M 12/3 Project Progress 5A Prototype Demo Ia
25 minutes per team

4:00: HP Team 2

4:30 HP Team 1

Tue 12/4 Project Progress 5B Prototype Demo Ib
25 minutes per team

2:55: Peregrine

3:30: Boeing Team 2

4:00: Boeing Team 1

4:30 Tektronix

Last update: November 27. 2001