Date |
Topic |
Readings |
Presenter |
| 8/21 (Tue) |
Course introduction and
administrative details |
None |
Ramana |
| 8/23 (Thu) |
Media Access and PHY details |
[Bha+94] |
Ramana |
| 8/28 (Tue) |
Routing in ad-hoc networks | [JMB01][Bro+98] | JC Chen |
| 8/30 (Thu) |
Geographic routing | [KK00][Li+00] | Immad/Ramana |
| 9/04 (Tue) |
Capacity of wireless networks |
[GK00] [Li+01] | Ramana/Ramana |
| 9/06 (Thu) |
Link metrics |
[Dec+03][DPZ04] |
Immad/Ramana |
| 9/11 (Tue) |
Multiple Radios |
[CBP04] |
Chris |
| 9/13 (Thu) |
Multiple Radios (contd) |
[MBK05] | Ramana |
| 9/18 (Tue) |
Power-sensitive Routing |
[Int+00] [Che+01] |
Immad/Abhinav |
| 9/20 (Thu) |
Power Savings |
[SBS02] |
Mohit |
| 9/25 (Tue) | Power Savings (contd.) |
[KB02] | Immad |
| 9/25 (Tue) |
Project
Proposals due |
||
| 9/27 (Thu) |
Rate Adaptation (for power
saving) |
[KS03] | Ramana |
| 10/2 (Tue) |
Rate
Adaptation (for throughput) |
[Won+06] | Immad |
| 10/4 (Thu) |
Monitoring and Diagnosis | [Che+06] [Che+07] | JC Chen/JC Chen |
| 10/9 (Tue) |
October
break (No classes) |
||
| 10/11(Thu) | Review
of papers so far |
Ramana |
|
| 10/16(Tue) | Wifi deployment in the wild | [Byc+06] [Ake+05] | Mohit/Ashish |
| 10/18(Thu) | Mesh networking | [Agu+04] [Bic+05] | Ashish /Ashish |
| 10/23(Tue) | Coding |
[BM05] [Kat+06] | Mohit/Mohit |
| 10/25(Thu) | Project discussion I |
||
| 10/30(Tue) | Analog Coding |
[Zha+06] [Kat+07] | Immad/Mohit |
| 11/1 (Thu) | Project discussion II |
|
|
| 11/6 (Tue) | Mobile IP |
[Per+98] | Abhinav |
| 11/8 (Thu) |
Leveraging Mobility to improve QoS
Optimizing placement of Integration points. |
||
| 11/13(Tue) |
Handoff |
[CI95] [BSK95] | Ashish/Ashish |
| 11/15(Thu) |
Project discussion IV |
||
| 11/20(Tue) |
Security |
[BGW01] [BS03] | Abhinav/Abhinav |
| 11/22(Thu) |
Thanksgiving
Break (No classes) |
||
| 11/27(Tue) |
Localization and Privacy | [BP00] [FC06] | Mohit/Abhinav |
| 11/29(Thu) |
Project discussion V |
||
| 12/04(Tue) |
Project discussion VI |
||
| 12/06(Thu) |
Final
project reports due |